Search Results

Displaying 1 - 3 of 3 results found
  • Content pages

    Flood Hazard and Risk Maps

    According to Floods Directive, the Member States shall, at the level of the river basin district or unit of management, prepare flood hazard maps and flood risk maps at the most appropriate scale for the areas identified under Article 5(1).

  • Content pages

    Joint Programme of Measures

    The Joint Programme of Measures is constructed upon the findings of the pressure analysis and the assessment of water status. These serve as the foundation for updating the Danube River Basin Management Plan, incorporating measures of basin-wide significance aligned with the established visions and management objectives outlined in the Water Framework Directive (WFD) for the year 2027.

  • Content pages

    Task Groups

    Task Groups (TGs) comprise national experts from ICPDR Contracting Parties and representatives of observer organizations. More topical than the Expert Groups of the ICPDR, Task Groups report to the Expert Groups and thereby make valuable contributions to the work of the ICPDR.