Search Results
Displaying 1 - 10 of 38 results found
-
DRBMP Update 2015 - Map 35: Ecological Prioritisation Regarding Restoration Measures for River and Habitat Continuity (1.82 MB)
-
DRBMP Update 2015 - Map 34: Alteration of River Continuity for Fish Migration – Expected Improvements by 2021 (2.04 MB)
-
DRBMP Update 2015 - Map 27: Hydropower Plants – Reference Situation 2012 (1.74 MB)
-
DRBMP Update 2015 - Map 20: Heavily Modified and Artificial Surface Water Bodies (1.58 MB)
-
DRBMP Update 2015 - Map 15: Future Infrastructure Projects (1.61 MB)
-
DRBMP Update 2015 - Map 12: Hydrological Alterations – Impoundments: Current Situation 2015 (1.66 MB)
-
DRBMP Update 2015 - Map 11: Wetlands / Floodplains (>500 ha) with Reconnection Potential (1.61 MB)
-
DRBMP Update 2015 - Map 9: Alteration of River Continuity for Fish Migration – Current Situation 2015 (1.68 MB)
-
Overview Reply Table - Consultation 1st DFRMP (127.27 KB)
Table with an overview of all comments on the 1st DFRMP as received during the public consultation phase vis a vis responses given by the ICPDR. Published December 2015. -
Overview Reply Table - Consultation DRBMP Update 2015 (215.08 KB)
Table with an overview of all comments on the DRBMP Update 2015 as received during the public consultation phase vis a vis responses given by the ICPDR. Published December 2015.