Search Results
Displaying 61 - 70 of 166 results found
Taking hydromorphology assessments for a test drive
Saving a sacred river
Danube:Future, achieving integrated sustainable development in the Danube River Basin
Fighting for the sturgeons
Groundwater: the river’s invisible twin
Providing safe passage routes on the Columbia River
A state of the sector: looking at water and wastewater in the Danube Basin
Public Participation Schedule WFD & FD
Vienna, 19 Dec 2018. According to Art. 14 of the Water Framework Directive, public participation in drafting River Basin Management Plans needs to be ensured. The ICPDR now provides a blue print for Public Participation activities for the development of the third Danube River Basin Management Plan (3rd DRBMP) until 2021 and the second Danube River Basin Flood Risk Management Plan (2nd FRMP).
-
Public Participation Schedule WFD & EFD (74.21 KB)
-
15th Ordinary Meeting: non-restricted slides (5.57 MB)