Search Results
Joining forces to offer sustainable solutions for wastewater treatment in the Danube River Basin
On 28-29 November 2017, over 120 participants from around 20 countries attended the first International Workshop on Wastewater Management in the Danube River Basin at the Ramada Majestic Hotel in Bucharest, Romania. The Workshop was co-organised by the ICPDR, the International Association of Water Supply Companies in the Danube River Catchment Area (IAWD), the World Bank and the Joint Research Center of the European Commission. The event was hosted by the National Administration “Romanian Waters” and the Romanian Ministry of Waters and Forests.
-
TNMN Yearbook 2014 Annex (4.56 MB)
-
TNMN Yearbook 2014 (3.96 MB)
ICPDR releases Report on the 2015 droughts in the Danube River Basin
In 2015 significant parts of the Danube River Basin were affected by droughts which negatively impacted different water-dependent economic sectors, vegetation and the aquatic environment. This is the latest of a series of drought events which occurred in Europe during the last decade.
-
The 2015 Droughts in the Danube River Basin (1.94 MB)
In 2015 significant parts of the Danube River Basin were affected by droughts which negatively impacted different water-dependent economic sectors, vegetation and the aquatic environment. This is the... Solutions for a frozen river: cross border ice control on the Danube
Ice control has a long history on the Danube river. The extremely low temperatures experienced in the past weeks throughout the Danube River basin which have been causing continuous ice formation on the Danube are reminding us of the importance of cross-border cooperation.
-
Annex to the report "The 2015 Droughts in the Danube River Basin" (2.7 MB)
The Annex includes the “Questionnaire on the 2015 Droughts in the Danube River Basin” completed by thirteen Danube countries (AT, BA, BG, CZ, DE, HR, HU, MD, RO, RS, SI, SK and UA) including... -
TNMN Yearbook 2009 - Data Annex (946 KB)
-
TNMN Yearbook 2009 (1.65 MB)
Joint Danube Delta Survey (JDDS) ready to start
Danube Delta, 26 September 2011. A detailed analysis and assessment of the Danube Delta will be held within the project "Joint environmental monitoring, assessment and exchange of information for integrated management of the Danube delta region" from 26 September until l 7 October 2011.