Search Results
Development of the Joint Statement in 2007
Between April and October 2007, an integrated stakeholder dialogue was conducted by ICPDR, Danube Commissson and the International Sava Commission. Main activities were 3 workshops and the drafting of the Joint Statement document.
-
Annex 2: DRBM Public Participation Outline Document (71.72 KB)
-
Annex 1: Significant Water Management Issues Document (1.18 MB)
Danube River Basin Management Plan (DRBMP) 2009
The Danube River Basin Management Plan guides the way to achieving at least good status for all waters of the Danube River Basin. The plan below covers the period from 2009 until 2015.
A grassroots programme for change in the Drava River Basin
ICPDR Danube Watch: Ecotourism boost in Danube-Drava National Park
Results from the Joint Danube Survey 2 distributed internationally
ICPDR Danube Watch: New EU members bring their own sea: good news or bad?
Sharing solutions with international river basins
ICPDR Danube Watch: The new riverbank at Hainburg
Danube Watch 3 2008 -The Danube River tells its story
ICPDR Danube Watch: The ICPDR in the spotlight
Invasion of the Danube
ICPDR Danube Watch: Searching for heavy metals behind the Iron Gates
Restoring the wetlands of the Záhorie Lowlands
ICPDR Danube Watch: Searching for heavy metals behind the Iron Gates