Search Results
Development of the Joint Statement in 2007
Between April and October 2007, an integrated stakeholder dialogue was conducted by ICPDR, Danube Commissson and the International Sava Commission. Main activities were 3 workshops and the drafting of the Joint Statement document.
-
Annex 2: DRBM Public Participation Outline Document (71.72 KB)
-
Annex 1: Significant Water Management Issues Document (1.18 MB)
Danube River Basin Management Plan (DRBMP) 2009
The Danube River Basin Management Plan guides the way to achieving at least good status for all waters of the Danube River Basin. The plan below covers the period from 2009 until 2015.
The Danube River brings Art Masters to Vienna
ICPDR Danube Watch: Youth parliaments held in Moldova go to the source
IWA World Water Congress and Exhibition: Danube, sanitation and climate
ICPDR Danube Watch: Work resumes on Bystroe Canal
Danube Watch 3 2008 -The Danube River tells its story
ICPDR Danube Watch: The ICPDR in the spotlight
Sharing solutions with international river basins
ICPDR Danube Watch: The new riverbank at Hainburg
Results from the Joint Danube Survey 2 distributed internationally
ICPDR Danube Watch: New EU members bring their own sea: good news or bad?
A grassroots programme for change in the Drava River Basin
ICPDR Danube Watch: Ecotourism boost in Danube-Drava National Park