Search Results
Displaying 1 - 9 of 9 results found
Danube Watch 3/2021 - ICPDR Presidency 2022
-
Preliminary Flood Risk Assessment in the Danube River Basin 2018 (1.86 MB)
-
Updated Integrated Tisza River Basin Management Plan 2019 - Annexes (8.08 MB)
-
Updated Integrated Tisza River Basin Management Plan 2019 (4.62 MB)
-
Annexes of the Integrated Tisza River Basin Management Plan 2010 (7.01 MB)
-
Preliminary Flood Risk Assessment Report 2012 (595.09 KB)
-
Integrated Tisza River Basin Management Plan 2010 (2.1 MB)
-
Danube Basin: Facts & Figures (6.56 MB)
Setting sail: Slovenia, the Danube and the EU Presidency
ICPDR Danube Watch: Youth parliaments held in Moldova go to the source