Search Results
Displaying 511 - 520 of 861 results found
-
Danube Watch 3/2012 (1.23 MB)
-
Annexes - 2012 Interim Report on the Implementation of the JPM in the DRBD (1.33 MB)
-
2012 Interim Report on the Implementation of the Joint Program of Measures in the DRBD (1.34 MB)
-
ICPDR Climate Change Adaptation Strategy 2012 (4.15 MB)
In order to take the required steps on adaptation to climate change, the ICPDR was asked in the “Danube Declaration” from 2010 to develop a Climate Adaptation Strategy for the Danube River Basin by... -
2010 Floods in the Danube River Basin (1.74 MB)
-
ICPDR Annual Report 2011 (4.21 MB)
-
ToR PP EG (266.49 KB)
Terms of Reference of the Public Participation Expert Group (PP EG) of the ICPDR, IC-107 rev3-final 2021 -
ToR FP EG (270.54 KB)
Terms of Reference of the Flood Protection Expert Group (FP EG), IC-106 rev3-final 2021 -
ToR PM EG (270.1 KB)
Terms of Reference of the Pressures and Measures Expert Group (PM EG), IC-105 rev3-final 2016 -
ToR MA EG (281.72 KB)
Terms of Reference of the Monitoring and Assessment Expert Group (MA EG) of the ICPDR, IC-104 rev3-final 2021