Search Results

Displaying 1 - 2 of 2 results found
  • Content pages

    Flood Action Plans

    17 flood action plans for all sub-basins in the Danube catchment area were prepared in 2009. They provide the first comprehensive overview of actions aiming to reduce flood risks that was ever prepared in Danube River Basin.

  • Content pages

    Accident Prevention

    Accidental pollution in the Danube River Basin can cause widespread damage to the environment, and endanger the health of local people and the state of local economies downstream. This was exemplified by the effects of the Baia Mare cyanide spill in Romania in 2000 or by the Hungarian redsludge accident at Ajka in 2010. The ICPDR is working to prevent accidental pollution and to improve response capability by compiling an inventory of all relevant "Accident Risk Spots".