Search Results
-
Public Consultation for the Draft Management Plan Updates 2027
The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of Water Framework Directive (WFD) and the Floods Directive (FD), comprising strategic guiding plans for water management over the course of six years. Both are to be updated with a range of public consultation measures.
-
Joint Programme of Measures
The Joint Programme of Measures is constructed upon the findings of the pressure analysis and the assessment of water status. These serve as the foundation for updating the Danube River Basin Management Plan, incorporating measures of basin-wide significance aligned with the established visions and management objectives outlined in the Water Framework Directive (WFD) for the year 2027.
-
Interim Report on Implementation of the Joint Program of Measures in the DRBD (2012)
Interim Report on Implementation of the Joint Program of Measures in the Danube River Basin District according to Water Framework Directive Art. 15 of 2012. Main report and relevant annexes.