Search Results

Displaying 1 - 10 of 28 results found
  • Content pages

    MonStur in the Danube Project

    Sturgeons, the most endangered group of species worldwide, are facing a perilous situation in Europe. These migratory species, which once freely swam from the Black Sea up to Germany, now find their ecological corridors severed by multiple barriers. Human interventions - such as hydropower, sediment extraction, navigation, river channelisation, by-catch and illegal fishing - are exerting severe pressure on habitats and populations, calling for immediate, coordinated actions.

  • Content pages

    Economics

    Water has an economic value in all its competing uses and therefore needs to be recognized as an economic good. In order to protect water as a valuable ressource, investments are needed to be implemented by Danube countries. The implementation of measures is beneficial for all sectors including water-related ecosystems.

  • Content pages

    Joint Programme of Measures

    The Joint Programme of Measures is constructed upon the findings of the pressure analysis and the assessment of water status. These serve as the foundation for updating the Danube River Basin Management Plan, incorporating measures of basin-wide significance aligned with the established visions and management objectives outlined in the Water Framework Directive (WFD) for the year 2027.

  • Content pages

    Significant Water Management Issues (SWMIS)

    The EU Water Framework Directive aims to make all waters cleaner and healthier. To meet these requirements, the ICPDR's Danube River Basin Management Plan closely examines the most important pressures affecting water status.
    Significant water management issues, called SWMIs, are the central pressures of basin-wide importance affecting the ecological and chemical status of surface waters, including pollution by organic substances, nutrients, and hazardous substances, as well as hydromorphological alterations. The first interim overview on the Significant Water Management Issues was created in 2007 for the 1st DRBM. The SWMIs outlined in this report were derived based on the requirements of the WFD and mainly related to quality aspects. For transboundary groundwater bodies, both qualitative and quantitative issues are addressed.

  • Publications

    A Joint Vision For Sustainable Flood Risk Management In Our Shared Basin (Low Resolution) (5.51 MB)

    Danube Flood Risk Management Plan – Update 2021: Public Brochure
  • Publications

    A Joint Vision for Sustainable River Basin Management In Our Shared Basin (Low Resolution) (8.16 MB)

    Danube River Basin Management Plan – Update 2021: Public Brochure
  • Publications

    A Joint Vision For Sustainable Flood Risk Management In Our Shared Basin (High Resolution) (32.32 MB)

    Danube Flood Risk Management Plan – Update 2021: Public Brochure
  • Publications

    A Joint Vision for Sustainable River Basin Management In Our Shared Basin (High Resolution) (53.26 MB)

    Danube River Basin Management Plan – Update 2021: Public Brochure
  • Publications

    We Pass: Explained (low resolution) (9.37 MB)

    A brochure explaining the findings and activities (2018 – 2021) under We Pass: Facilitating Fish Migration and Conservation at the Iron Gates. (Lower Resolution version)
  • Publications

    We Pass: Explained (15.01 MB)

    A brochure explaining the findings and activities (2018 – 2021) under We Pass: Facilitating Fish Migration and Conservation at the Iron Gates.