Search Results
-
Making the Iron Gate Dams Passable - We Pass 2 (1.98 MB)
The We Pass 2 project is an initiative focused on restoring fish migration routes in the Danube River Basin, particularly at the Iron Gate Dams. By addressing the barriers caused by these hydropower... -
Interim Report on the Implementation of the Joint Program of Measures in the Danube River Basin 2024 (21.78 MB)
This brochure is a snapshot of the progress to implement measures improving the environmental situation of the waters in the Danube River Basin today and what’s still yet to come as the region’s many... Economics
Water has an economic value in all its competing uses and therefore needs to be recognized as an economic good. In order to protect water as a valuable ressource, investments are needed to be implemented by Danube countries. The implementation of measures is beneficial for all sectors including water-related ecosystems.
Joint Programme of Measures
The Joint Programme of Measures is constructed upon the findings of the pressure analysis and the assessment of water status. These serve as the foundation for updating the Danube River Basin Management Plan, incorporating measures of basin-wide significance aligned with the established visions and management objectives outlined in the Water Framework Directive (WFD) for the year 2027.
Significant Water Management Issues (SWMIS)
The EU Water Framework Directive aims to make all waters cleaner and healthier. To meet these requirements, the ICPDR's Danube River Basin Management Plan closely examines the most important pressures affecting water status.
Significant water management issues, called SWMIs, are the central pressures of basin-wide importance affecting the ecological and chemical status of surface waters, including pollution by organic substances, nutrients, and hazardous substances, as well as hydromorphological alterations. The first interim overview on the Significant Water Management Issues was created in 2007 for the 1st DRBM. The SWMIs outlined in this report were derived based on the requirements of the WFD and mainly related to quality aspects. For transboundary groundwater bodies, both qualitative and quantitative issues are addressed.Danube Watch 3/2021 - Danube River Basin Management Plan
-
DRBMP Update 2021 Annex 21 - Financing Joint Programme of Measures (319.97 KB)
-
DRBMP Update 2021 Annex 20 - Disconnected Wetlands and Former Floodplains (255.36 KB)
Disconnected Wetlands and Former Floodplains with Potential for Reconnection -
DRBMP Update 2021 Annex 19 - Hydromorphological lighthouse projects (4.43 MB)
Hydromorphological lighthouse projects in the Danube River Basin District (2015-2021) -
DRBMP Update 2021 Annex 18 - Detailed List of Hydrological Alterations (687.94 KB)