Library
Publications, documents and all other content
Displaying 41 - 50 of 64 items
-
DRBMP Update 2015 - Map 34: Alteration of River Continuity for Fish Migration – Expected Improvements by 2021 (2.04 MB)
-
DRBMP Update 2015 - Map 27: Hydropower Plants – Reference Situation 2012 (1.74 MB)
-
DRBMP Update 2015 - Map 20: Heavily Modified and Artificial Surface Water Bodies (1.58 MB)
-
DRBMP Update 2015 - Map 15: Future Infrastructure Projects (1.61 MB)
-
DRBMP Update 2015 - Map 12: Hydrological Alterations – Impoundments: Current Situation 2015 (1.66 MB)
-
DRBMP Update 2015 - Map 11: Wetlands / Floodplains (>500 ha) with Reconnection Potential (1.61 MB)
-
DRBMP Update 2015 - Map 9: Alteration of River Continuity for Fish Migration – Current Situation 2015 (1.68 MB)
-
Annexes of the Integrated Tisza River Basin Management Plan 2010 (7.01 MB)
-
Maps of the Integrated Tisza River Basin Management Plan 2010 (15.86 MB)
-
Donors conference for Serbia and Bosnia and Herzegovina: “Rebuilding Together”
Brussels, 16 July 2014. An international donors conference raised millions in support of flood victims in Serbia and Bosnia and Herzegovina. High-level speakers including French minister of foreign affairs Laurent Fabius also underlined the importance of river basin management and the role of ICPDR and ISRBC.