Library
Publications, documents and all other content
Displaying 1 - 10 of 19 items
-
DRBMP Update 2015 - Map 35: Ecological Prioritisation Regarding Restoration Measures for River and Habitat Continuity (1.82 MB)
-
DRBMP Update 2015 - Map 34: Alteration of River Continuity for Fish Migration – Expected Improvements by 2021 (2.04 MB)
-
DRBMP Update 2015 - Map 27: Hydropower Plants – Reference Situation 2012 (1.74 MB)
-
DRBMP Update 2015 - Map 20: Heavily Modified and Artificial Surface Water Bodies (1.58 MB)
-
DRBMP Update 2015 - Map 15: Future Infrastructure Projects (1.61 MB)
-
DRBMP Update 2015 - Map 12: Hydrological Alterations – Impoundments: Current Situation 2015 (1.66 MB)
-
DRBMP Update 2015 - Map 11: Wetlands / Floodplains (>500 ha) with Reconnection Potential (1.61 MB)
-
DRBMP Update 2015 - Map 9: Alteration of River Continuity for Fish Migration – Current Situation 2015 (1.68 MB)
-
DRBMP Update 2015 - Map 2: Ecoregions (1.55 MB)
-
Public consultation concludes with strong feedback
Danube Basin, 23 July 2015. For over six months, stakeholders of the Danube were called to share their views on the draft management plans for the Danube River Basin. As of 22 July, the public consultation phase convened with strong feedback received through different channels.