Management Plans
Here you can download all versions of the Danube River Basin Management Plans and Danube Flood Risk Management Plans of the ICPDR.
Displaying 1 - 9 of 9 items
-
FRM Plan: Draft Annex 4 (Bilateral Agreements) (162.78 KB)
The draft Annex 4 of the 1st Flood Risk Management Plan for the DRB, provided for public comments. -
FRM Plan: Draft Annex 3 (Competent Authorities) (126.9 KB)
The draft Annex 3 of the 1st Flood Risk Management Plan for the DRB, provided for public comments. -
FRM Plan: Draft Annex 2 (Measures) (288.2 KB)
The draft Annex 2 of the 1st Flood Risk Management Plan for the DRB, provided for public comments. -
FRM Plan: Draft 1st Flood Risk Management Plan for the DRB (9.31 MB)
The draft 1st Flood Risk Management Plan for the Danube River Basin, provided for public comments -
DRBM Plan Annexes (5.02 MB)
complete set, 426 pages -
Danube River Basin Management Plan (8.44 MB)
-
Annex 2: DRBM Public Participation Outline Document (71.72 KB)
-
Annex 1: Significant Water Management Issues Document (1.18 MB)
-
Danube River Basin Management Plan (DRBMP) 2009
The Danube River Basin Management Plan guides the way to achieving at least good status for all waters of the Danube River Basin. The plan below covers the period from 2009 until 2015.