Search Results
-
2013 Floods in the Danube River Basin (1.39 MB)
-
Danube Basin Analysis 2013 - Maps (36.85 MB)
-
Danube Basin Analysis 2013 - Report (3.07 MB)
-
Danube Basin Analysis 2013 - Annex (7.7 MB)
Danube River Basin Analysis 2013
The 2013 Update of the Danube Basin Analysis provides a characterisation of the river basin district, a review of the environmental impact of human activity and an economic analysis of water use. This was first accomplished for the Danube River Basin in 2004 and is now updated. The updated assessment provides the analytical basis and is a preparatory step towards the elaboration of the Danube River Basin Management Plan - Update 2015.
Public consultation on 2015 management plans
The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. The most important work plans of the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan. Both were developed with a range of public consultation measures.
-
AEWS Manual (769.2 KB)
International Operations Manual for PIACs of the Danube AEWS. -
AEWS Manual - Deutsch (331.12 KB)
International Operations Manual for PIACs of the Danube AEWS - German translation German photography award for JDS3 photo essay
Bremen/Leipzig, 24 September 2014. The photographer André Künzelmann was awarded the “Deutscher Preis für Wissenschaftsfotografie”, a prestigious award for science photography for a photo essay on the Joint Danube Survey 3.