Search Results
-
Annex (3.38 MB)
Photographic documentation of the ITR sampling mission, 2001 -
Final Report (1.72 MB)
Joint Danube Survey: Investigation of the Tisza River and its tributaries Final Report, May 2002 -
Tisza Group, Memorandum of Understanding (2004) (40.08 KB)
"Strengthening of Tisza River Basin cooperation: Towards the implementation of the Integrated Tisza River Basin Management Plan supporting the sustainable development of the region" -
Staff Regulations of the ICPDR (93.49 KB)
Document No.: IC/005. -
Job description of the Secretariat (97.31 KB)
Main Functions and Job Descriptions of the Permanent Secretariat of the ICPDR. Document No.: IC/004 Tisza Investigation
The investigation of the Tisza River was a follow-up project of the Joint Danube Survey 2001 organised by the ICPDR. The objective of the survey was to investigate the water quality along the river and to promote public awareness. The countries participating at the survey include Romania, Slovakia, Hungary, and Serbia and Montenegro.
-
ToR ad-hoc Strategic EG (156.22 KB)
Terms of Reference of the ad-hoc Strategic Expert Group, IC/108 2005 Observers
In keeping with commitments to engaging the public, the ICPDR maintains close relationship with some 24 organisations – representing a variety of public interests – defined by the DRPC as “Observers”.
Expert Groups
Expert Groups (EGs) are the backbone of the operation and the success of the ICPDR. They are composed of national experts from the Contracting Parties and representatives from ICPDR observer organisations. Eight different Expert Groups deal with a variety of issues and make recommendations to the ICPDR.
AEWS - Accident Emergency Warning System
The Accident Emergency Warning System (AEWS) of the Danube River Basin is activated whenever there is a risk of transboundary water pollution, or threshold danger levels of certain hazardous substances are exceeded.