Search Results

Displaying 1 - 9 of 9 results found
  • Content pages

    Public Consultation: Results

    This page contains all of the various documentation on outcomes from the ICPDR's Public Consultation Process for the Danube River Basin Management Plan & Danube Flood Risk Management Plan Updates 2021

  • Content pages

    Stakeholder Consultation Workshop: Our Opinion – Our Danube

    This online workshop took place on 29th/30th June 2021, with more than 130 participants attending.

  • Content pages

    Public Consultation for the Draft Management Plan Updates 2021

    The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of WFD and FD, comprising strategic guiding plans for water management over the course of six years. Both are to be developed with a range of public consultation measures.

  • Content pages

    Montenegro

    Montenegro, literally meaning the “black mountain”, is a small upland country. Just over half of its territory lies within the Danube River Basin, the remainder being in the Adriatic Sea catchment. Notable Danube rivers are the Tara, Piva, Lim and Ćehotina and the Ibar. In October 2008, the Convention on Cooperation for the Protection and Sustainable Use of the Danube River came into force in Montenegro.

  • Content pages

    Integrated Land Development Project - Component 2 - UNDP/GEF Tisza MSP - ILD to improve land use and water management efficiency in the Tisza basin

    Integrated land development is a key of sustainable resource management and should be tested in a pilot project in Hungary. The outcomes of the project will also be disseminated in Serbia and Romania and should give the principle of integrated land development a boost in the Tisza River Basin.

  • Content pages

    Upper Tisza demonstration Project - Component 2 - UNDP/GEF Tisza MSP - Selected measures for integrated land and water management

    Projects should have a clear impact on the livelihood of local people - this is especially true for the UNDP/GEF project “Integrating multiple benefits of wetlands and floodplains into improved trans-boundary management for the Tisza River Basin”. This pilot project is currently carried out on the Upper Tisza, in a village literally divided by the Tisza into two countries.

  • Content pages

    Bodrog demonstration Project - Component 2 - UNDP/GEF Tisza MSP - Making space for water in the Bodrog River Basin

    The Bodrog River Basin makes part of the Tisza River Basin and is shared by Slovakia, Hungary and Ukraine. Environmental problems and flood damages are increasing and putting pressures on the people - high time for a project of the UNDP / GEF to promote multiple benefits of wetlands and floodplains.

  • Content pages

    Joint Statement follow-up meetings - Budapest 2009 and Zagreb 2010

    The Danube navigation dialogue, concluded in October 2007 with the finalisation of the "Joint Statement", is continued. A first follow-up meeting was held in January 2009 in Budapest, a second one is held in March 2010 in Zagreb, serving to assessing the progress achieved so far and discussing how to improve the application of the "Joint Statement" in waterway projects.

  • Content pages

    Development of the Joint Statement in 2007

    Between April and October 2007, an integrated stakeholder dialogue was conducted by ICPDR, Danube Commissson and the International Sava Commission. Main activities were 3 workshops and the drafting of the Joint Statement document.